Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 21 results ...

Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects, Unpublished PhD Thesis, , Oklahoma State University.

Alroomi, A S (2013) Integrative framework for sustainable development of the cost estimating profession, Unpublished PhD Thesis, , Oklahoma State University.

Brown, B H J (1974) An econometric forecasting model for a segment of the construction market, Unpublished PhD Thesis, , Oklahoma State University.

Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates, Unpublished PhD Thesis, , Oklahoma State University.

Eldin, N N (1987) Methodology for project management control in the construction industry, Unpublished PhD Thesis, , Oklahoma State University.

  • Type: Thesis
  • Keywords: failure; construction project; productivity; project cost; financial ratio
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/303623584
  • Abstract:
    Scope and method of study. This research was conducted to develop a new approach to evaluate the performance of construction projects. The new approach differs from the current common practice in two main areas. The traditional search for one integrated descriptor for the success or failure of the entire project is replaced by evaluating the performance of selected project components only. Next, a set of ratios analogous to the financial ratios used to appraise businesses were utilized to identify cost items having a potential for financial problems and to determine the monetary impact on the final project cost. A set of control ratios capable of describing the progress conditions of each project's work items was selected. Forecasts and performance indices utilizing the selected ratios were computed by examining the relationships between the actual and budgeted value of the control ratios. A problem detection technique was developed to detect areas in the project having potential financial problems. An algorithm was devised to identify the immediate cause(s) of such problems and to determine their monetary impact on the final project cost. Findings and conclusions. An actual construction project was included in the study as a numerical illustration of and as a guide to the application of the developed problem detection technique. The technique was successful in identifying the cost items having financial problems, determining the causes of such problems, and assessing their monetary impact on the final project cost. This investigation was limited to evaluating and detecting problems due to labor costs, material costs, and extra costs due to low labor productivity.

Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time, Unpublished PhD Thesis, , Oklahoma State University.

Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment, Unpublished PhD Thesis, , Oklahoma State University.

Johnson, L R (1969) A competitive strategy model for highway construction proposals, Unpublished PhD Thesis, , Oklahoma State University.

Karimi, B (2018) Evaluation of emissions reduction strategies for heavy duty diesel construction equipment, Unpublished PhD Thesis, , Oklahoma State University.

Kim, J (2022) A multimodal approach to improve fire safety on construction sites, Unpublished PhD Thesis, , Oklahoma State University.

King-Lewis, A (2020) Diversity and inclusion of women in the construction industry, Unpublished PhD Thesis, , Oklahoma State University.

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities, Unpublished PhD Thesis, , Oklahoma State University.

Lusby, A K (2003) The effect of increased public investment in transportation infrastructure on oklahoma's economic development, Unpublished PhD Thesis, , Oklahoma State University.

Miller, R H (1973) Life cycle system model for estimating construction equipment ownership costs, Unpublished PhD Thesis, , Oklahoma State University.

Rainer, R K (1968) Predicting productivity of one or two elevators for construction of high-rise buildings, Unpublished PhD Thesis, , Oklahoma State University.

Shararah, H H (1981) Evaluation of wall construction techniques based upon economical factors influencing labor and materials, Unpublished PhD Thesis, , Oklahoma State University.

Spencer, G R (1987) Integration of cost estimating with critical path scheduling, Unpublished PhD Thesis, , Oklahoma State University.

Syachrani, S (2010) Advanced sewer asset management using dynamic deterioration models, Unpublished PhD Thesis, , Oklahoma State University.

Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation, Unpublished PhD Thesis, , Oklahoma State University.

Trost, S M (1998) A quantitative model for predicting the accuracy of early cost estimates for construction projects in the process industry, Unpublished PhD Thesis, , Oklahoma State University.

Zeitoun, A A (1992) Evaluation of cost and schedule growth trends during construction, Unpublished PhD Thesis, , Oklahoma State University.